ORDER YOU EV CHARGE POINT TODAY.
Option 1 – Zaptec Go
Zaptec Go is a compact, smart and safe EV charger that works with any EV and can be installed in minutes. It comes with a Zaptec App that lets you control, monitor and optimize your charging, and offers six colour options to suit your style.
- 7kW
- Designed and manufactured in Norway for some of the roughest weather on the planet.
- 5-year guarantee – built to last.
- 6 colours – Blend in or stand out, your choice.
- Built in (subscription free) 4g LTE-M
- Built in Pen Fault Protection
- Size of a Tablet and only 1.3kg
- Charges any car
- Red Dot Award winner 2021 & 2021
- Nominated in 2 categories EVIE awards in November
Price: £0000.00 (inclusive of VAT and standard installation)
Option 2 – Vchrgd Seven
The Vchrgd Seven is the perfect combination of easy-to-use, feature-rich and aesthetically pleasing, all for a market-leading price point. Including smart tariff integration for Octopus customers, charging authentication & charge history, cost tracking, RFID & much more…
- 7kW
- Load Management
- PEN Fault protection – No earth rod required
- Mobile control and smart App.
- Solar compatible.
- Your choice of type 1 or type 2 cable
- Tariff/scheduled charging mode
- 5, 7.5 or 10 metre tethered options
Price: £0000.00 (inclusive of VAT and standard installation)
What does a standard installation include?
- Installation of the charge point on a brick or plaster wall, or other suitable permanent structure.
- Up to 10 metres of cable surface-mounted to the wall, between the supply meter or distribution board and the charging point, cable clipped direct to the wall surface, maximum 4 bends. At a height not exceeding 1.7m.
- Drilling of 1 hole up to 60mm diameter, to accommodate 1, 6mm cable and data cable.
- The fitting and testing of electrical connections, type A RCD, surge protection device.
- Make good all drilling and penetrations to walls.
- Ensure connectivity for smart functionality on the unit. Customer demonstration of unit, controls and mobile application
- Transport of unit from storage to customer property along with all required installation materials.
- Compliant to latest wiring regulations
- Plastic conduit/trunking to conceal interior wiring, up to 5m with 1 bend.
- An electrical certificate will be issued to the customer within 28 days of the installation following an internal checking and auditing process.
- DNO (Distribution Network Operator) notification.
